01 / ASSESS THE ROOF
Start with what is there.
Exposed sheets, rust, seams and penetrations are inspected first. The deck must be suitable to retain before a restoration system is specified.
Roof condition decides the path.
RESTORATION OPTIONS
| Option | Short-Term Patch | Roof Replacement | Spray Foam TAS |
|---|---|---|---|
| Existing metal roof | Remains in service where the local repair holds. | Removed and replaced. | Assessed as part of the restoration system. |
| How water is handled | Addresses the identified leak or damaged area. | New roof components provide a new external layer. | Designed around the roof condition and water-entry details. |
| Penetrations and details | Usually treated individually as issues arise. | Reworked during replacement where required. | Included in the system scope after inspection. |
| Thermal bridges | Typically unchanged. | Depends on the replacement design. | Considered as part of the overall roof approach. |
| Operations below | May suit a limited, local repair. | Work planning depends on the replacement scope. | Planned around access, safety and the area below. |
| When it is the better fit | For an isolated issue where a repair is appropriate. | When the roof needs comprehensive replacement. | When a restoration system is appropriate for the roof and site conditions. |
The new roof boundary
Select a stage to follow the same roof from its original condition through cleaning, priming, foam and the protective topcoat.

Choose a stage
01 / ASSESS THE ROOF
Exposed sheets, rust, seams and penetrations are inspected first. The deck must be suitable to retain before a restoration system is specified.
Roof condition decides the path.
02 / PREPARE THE SURFACE
Cleaning removes loose contamination and exposes areas needing repair. Drainage, rust and existing details are checked before the next stage.
A sound preparation matters as much as the finish.
03 / REPAIR AND PRIME
Unsuitable details are repaired and the specified primer is applied where required. The roof is prepared to receive the fully adhered insulated layer.
The new system starts with the prepared metal.
04 / FORM THE INSULATED BARRIER
Closed-cell foam follows the corrugations, covers treated fixings and is detailed around suitable penetrations. It adds an insulated, self-flashing layer above the existing deck.
A continuous thermal break and treated weather seal.
05 / PROTECT THE SYSTEM
The specified topcoat protects the foam from sun and weather. The finished roof and its details are checked before handover.
The exterior face is renewed and protected.
Short-term patch repairs can become a cycle in which the roof stays and the leak returns. Spray Foam TAS treats the roof as one continuous waterproofing system; however, a patch can be the better fit when the problem is genuinely local, the surrounding roof remains serviceable and whole-roof restoration is not warranted.
Spray Foam TAS retains the existing metal roof and adds a continuous, fully adhered closed-cell SPF waterproofing system with a protective silicone topcoat. Conventional roof replacement is a better fit when inspection confirms the existing roof is not suitable for retention.
Closed-cell SPF forms a continuous, fully adhered, seamless waterproofing membrane that prevents water passing through the foam or travelling laterally within it. We do not claim that every leak route or installation defect is eliminated; the existing roof must be suitable, properly prepared and installed as a completed system.
A continuous, fully adhered closed-cell SPF layer covers fasteners, gaps and other thermal bridges. By providing continuous insulation and a thermal break, closed-cell SPF can reduce the potential for condensation on metal roof surfaces. Actual performance depends on climate, internal humidity, air and vapour control, continuity and completed-system design; no Spray Foam TAS R-value or energy saving is claimed here.
Yes. We operate from Launceston and Glenorchy and service Hobart, Launceston, Devonport, Burnie, Ulverstone, Kingston and everywhere in between.
Yes. Spray Foam TAS work is covered by a 25-year warranty on goods and workmanship. It is contractual, with stated exclusions — not a lifetime warranty. Terms are confirmed with the quote after inspection.
We do not publish square-metre rates from this page. A project-specific roof inspection is how suitability, preparation and the right path are established — before any recommendation or quote.